Airport Art Steering Committee [1]
AGENDA
Airport Art Steering Committee
Monday, April 29, 2019
2–3pm
401 Van Ness Avenue, Suite 302
1. Approval of 10/04/2018 Minutes
Attached: 10/04/2019 Minutes
2. Grand Hyatt Hotel 2D Program
Zoë Taleporos
Action
Explanatory Documents: Additional 2D Artwork
Overview of Grand Hyatt Hotel Artwork Program and presentation of additional 2D Artwork for purchase.
Motion: Motion to approve the purchase of the following artworks for display at the San Francisco International Airport Grand Hyatt Hotel:
Natalya Burd, So much more than this, 2018, acrylic, mirror, Plexiglas, 47 in. by 94 in., $9,000.
John Chiara, Cabrillo Highway at Pescadero Creek Road, Variation 4, 2017, Camera Obscura Ilfochrome photograph, 58 in. by 71 in. framed, $27,000.
Klea McKenna, Born in 1717, 2017, gelatin silver photogram, 43 in. by 50 in. framed, $9,800.
Crystal Liu, underground, ‘stuck in between’, 2016, collage, gouache, ink and watercolor on paper, 47 in. by 104 in., $24,000.
Motion: Motion to approve the reinstallation of the following artworks for display at the San Francisco International Airport Grand Hyatt Hotel:
Michael Dvortcsak, Sublimens, 1986, oil and wax on canvas, 87 ½ in. by 72 ½ in. by 1 ¾ in.
3. International Terminal Refresh Phase 1
Susan Pontious
Action
Explanatory Documents: Program Descriptions; Power Point presentation
Presentation of the revised Art Program for the International Terminal Building Refresh Phase 1.
Motion: Motion to approve the revised Art Program for the International Terminal Building Refresh Phase 1.
4. Terminal 3, Courtyard Connector
Susan Pontious
Action
Explanatory Documents: Program Descriptions; Power Point presentation
Presentation of the Art Program plan for the Courtyard 3 Connector.
Motion: Motion to approve the Art Program plan for the Terminal 3, Courtyard 3 Connector.
Motion: Motion to pursue commissioning Untitled by Alison Saar for Terminal 3, Courtyard 3 Connector.
5. Terminal 2 Buildback
Susan Pontious
Explanatory Documents: Power Point presentation
Presentation of the Art Program plan for the T2 Build back, reallocating AE to SFO Hotel.
Motion: Motion to approve the Art Program plan for the T2 Build back, reallocating AE to SFO Hotel.
6. San Francisco International Airport: New Project Site Walkthrough
Susan Pontious
Discussion
Explanatory Documents: Program Description; Power Point presentation
City Hall can be reached via public transportation: The nearest accessible BART station is Civic Center Plaza at the intersection of Market, Grove, and Hyde Streets. The accessible MUNI Metro lines are the J, K, L, M, and N (Civic Center Station or Van Ness Avenue Station). MUNI bus lines serving the area are the 47 Van Ness, the 49 Van Ness, 9 San Bruno, 5-Fulton, 6, 7, and 21-Hayes. Accessible curbside parking is available on 1 Dr. Carlton B. Goodlett Place and Grove Street. Visit SFMTA [6] to map your route.
City Hall is accessible to persons using wheelchairs and other assistive mobility devices. Wheelchair access is provided at the Grove, Van Ness and McAllister streets via ramps. Wheelchair access at the Polk Street/ Carlton B. Goodlett entrance is provided through a wheelchair lift. The hearing room is wheelchair accessible.
War Memorial Veterans Building can be reached via public transportation: The nearest accessible BART station is Civic Center Plaza at the intersection of Market, Grove, and Hyde Streets. The accessible MUNI Metro lines are the J, K, L, M, and N (Civic Center Station or Van Ness Avenue Station). MUNI bus lines serving the area are the 47 Van Ness, the 49 Van Ness, 9 San Bruno, 5-Fulton, 6, 7, and 21-Hayes. Visit SFMTA [6] to map your route.
War Memorial Veterans Building is accessible to persons using wheelchairs and other assistive mobility devices. The hearing room is wheelchair accessible.